zm-logo-white

Waste Incinerator Plant in Zuchwill, Switzerland

Construction of the new block of the Emmenspitz waste incinerator plant

Client:

HITACHI ZOSEN INOVA

Works:

Assembly of steel structures, equipment and channels

Period:

2022 – 2024

Country:

Switzerland